FlagLine™

iOS 26+ and iPadOS

Offline by design. Built for the pool deck.

A friendly swim stopwatch for coaches, volunteers and parents. Time every lane, keep times and rosters in step across coaches' phones, and plan the meet from its PDFs, all with no internet, no accounts and nothing leaving the phone.

  • Offline by design
  • Works in Airplane Mode
  • Syncs phone to phone, no Wi-Fi needed
  • No accounts, no ads, no tracking
  • Made for kids' swim teams
  • iPhone and iPad

Coming soon: $4.99, paid once. No subscription, no ads.

Want early access? Email betatester@goofflinebydesign.com to join the beta.

FlagLine timing screen with two lane buttons showing splits for a 100 yard freestyle
Tap once per lane

What's inside

  • One tap per lane

    Big lane buttons record every split the moment you tap, and every tap is saved to disk before the screen reacts.

  • Pair once, then it just syncs

    One screen: show your code, scan theirs, and check that the same six digits appear on both phones. After that, paired coaches find each other automatically every time.

  • Start a race, coaches join

    When one coach gets a race ready, every nearby paired coach sees a Join banner on whatever screen they're on. One tap and they're timing too.

  • No lanes assigned? Still works

    Skip lane assignments and every coach can time every lane. Other coaches' times and splits show up live as they're recorded.

  • One reader per lane

    Once a coach taps a swimmer, the other coaches' buttons for that lane switch off, so you never end up with two records for one swim.

  • iPhone and iPad, one coach

    Add your other device once and your swimmers, history and meets stay level between them whenever the app is open on both, with no cloud and no sign-in.

  • Borrow a trusted coach's roster

    A new coach can ask a paired coach for the swimmer list, plus the history and meets if they like. Nothing is sent until that coach says yes.

  • Meet PDFs, read on your phone

    Import a Meet Program, heats and lanes, or results PDF (HY-TEK style) and FlagLine finds your team's swimmers, seeds, heats and lanes.

  • Race-day board

    See events, heats, lanes and seed times, tap Time on any event to start timing it, and let official results reconcile with your stopwatch afterward.

  • Share a swimmer's times

    Turn a swimmer's meet results or season bests into a good-looking picture card that parents can post or send to the family chat. Only that swimmer's own times are on it.

  • Parents can follow

    Star a swimmer to watch them, then show only their events and heats.

  • Progress for every swimmer

    Personal bests, progress charts and consistency per swimmer, with a progress report PDF and CSV export.

  • Built for iPad too

    On a bigger screen you get a sidebar, a race preview beside setup, and every lane and split at once.

  • Help on every screen

    A friendly tour on first launch and a help button on every page, for the volunteers who'll never read a manual.

The whole idea

Offline by design, not offline “when it can”

Pool decks are concrete, humid and crowded, and cell service and Wi-Fi come and go. So FlagLine never asks for the internet in the first place. It has no server to reach, no account to sign into and no network code at all. A flaky connection can't spoil a race it was never part of.

  • Timing needs nothing

    Airplane Mode is fine

    Every tap is written to disk before the screen reacts. If the phone locks or the app closes, FlagLine offers to pick the race back up.

  • Sync is phone to phone

    No router, no cloud

    Coaches' phones talk directly over Bluetooth and peer-to-peer Wi-Fi. There's nothing in the middle to be down, slow or hacked.

  • Dropped out? Catch up

    Nothing gets lost

    If a phone wanders out of range, it simply catches up when it's back. Every phone ends up with the same times, whatever order they arrived in.

  • Nothing to sign into

    No accounts

    No passwords to forget on race morning, and no company holding your swimmers' data.

Everything works with no signal. Sharing between coaches uses only the two phones, never the internet.

Together

Made for coaches, volunteers and parents

Times and rosters, kept in step, securely

Pairing is a one-time handshake. One phone shows a code, the other scans it, and both show the same six digits to confirm nobody is listening in. After that, phones recognize each other by a cryptographic key, not by name, and a phone you haven't paired can't add a time to your race.

Every time and split is signed by the coach's phone that recorded it and sealed before it travels, so what arrives is what was sent and who sent it. Coach names and swimmer details are never broadcast while phones look for each other.

Coaches see each other's splits live. When lanes are open and two coaches tap the same swimmer, the first tap claims the lane, and every phone agrees on the same winner, so the results page shows one clean time per swimmer.

A new assistant coach can ask a coach they trust for the swimmer roster, with history and meets too if they want. The other coach sees exactly what's being asked for and has to approve it.

OK for kids' swim teams

FlagLine was designed around children's information. It collects nothing from anyone, children have no accounts or logins, and there's no server, so there is nothing of theirs for us to hold, sell or lose.

Parents can use it freely to follow a swimmer through a meet. A swimmer's progress report contains only that swimmer's own times. For a team phone, an optional Face ID or passcode lock keeps it private, and it never locks in the middle of a race.

Friendly to volunteers

Plenty of the people holding the stopwatch are parents who volunteered an hour ago. FlagLine opens with a short tour, puts a help button on every screen, uses plain words, and asks each coach for their name and team up front so every record says who timed it.

It's made for people working side by side: one coach on each end of the pool, a volunteer on the board, a parent in the stands, all looking at the same race.

Why $4.99

Getting a stopwatch right is mostly testing. We simulate dropped, duplicated and out-of-order messages between coaches' phones, stress the pairing and the join flow, and check each screen on small and large iPhones and iPad. The nominal $4.99, paid once, is there to cover all of that, so the app never has to make its money from the kids' data.

Paid apps, just like the old days

How FlagLine actually handles your data: No network requests · Everything is stored on your device · Nearby coach sync, only with phones you've paired · Camera, for pairing · Face ID, optional · Copying a roster needs the other coach's OK · Files you share in stay on the device · No third-party SDKs, no account · Exports go where you send them. See the privacy policy for the full breakdown.
← Back to all apps